PC Particle American UL94 - 青岛云塑高分子材料科技有限公司
您的位置: 网站首页>> 新闻动态>> 行业新闻>>

新闻动态

联系我们

青岛云塑高分子材料科技有限公司

地址:山东青岛即墨区段泊岚镇方戈庄工业区

咨询热线0532-68965111

PC Particle American UL94

作者:云塑 发布时间:2025-12-30 16:10 人气:2

PC(Polycarbonate)material must meet strict fire performance requirements when undergoing the American UL94-V0 flame retardant test. The following is a summary of key information:

1. UL94-V0 testing standard

  • Test content: Evaluate the flame retardant properties of materials during vertical combustion.

  • Judging criteria (V0 level):

    • Single sample combustion time ≤ 10 seconds.

    • 5 samples total combustion time ≤ 50 seconds.

    • No molten droplets from ignited cotton.

    • No combustion or smoldering for more than 30 seconds after the second removal of the flame source.


2. Modification requirements for PC materials.

  • Basic Features:PCIt inherently has V2 flame retardancy and needs to be modified to reach V0 level.

  • Common modification methods:

    • Add bromine/phosphorus flame retardants (such as tetrabromobisphenol A).

    • English compound antimony trioxide (Sb₂O₃) as a co-effector.

    • Use halogen-free flame retardants (such as organosilicon series, phosphates) to meet environmental protection requirements.

3. Key steps of the testing process

  1. Sample Preparation: 125mm × 13mm × Standard thickness (common 0.8mm, 1.6mm, 3.2mm).

  2. Pre-treatment48 hours (23±2℃, 50±5% humidity).

  3. Combustion test:

    • Vertical fixed sample, apply blue flame (20mm high) twice, each for 10 seconds.

    • Record the burning time, dripping matter, and ignition situation.

4. Other related UL94 ratings

  • V1/V2 level:Combustion time is slightly longer than V0, allows limited droplets (V2 level may ignite cotton).

  • 5VA/5VB:More stringent horizontal combustion test, suitable for high flame retardant demand scenarios.

5. Authentication注意事项

  • Thickness influence: Thin specimens are more difficult to pass the test, and the actual product thickness needs to be specified clearly.

  • Other tests: May require combination with ROHS, REACH and other environmental protection regulations.

  • Accreditation Institution: The manufacturer must pass the authorization test of the UL authorized laboratory and submit the report.

推荐资讯

0532-68965111